The plans also incorporate a huge battery at the site, to ensure excess electric power is usually saved with the night, and also a 220 kV transmission line which is able to connect the project to your North Star sub-station, close to wherever a whole new 100 MW solar job https://citypointsolar.com.au/50kw-solar-system/